Water Supply Project:
- We are currently implementing Amruth 2.0 - Package 01, as JV with AMRIL & IHP across 30 Urban Local Bodies (ULBs) and sewerage projects in 3 ULBs under the Adilabad, Karimnagar, and Warangal PH Divisions.
- The project encompasses the construction of Elevated Level Service Reservoirs (ELSRs), Elevated Level Balancing Reservoirs (ELBRs), sumps, Sewage Treatment Plants (STPs), Water Treatment Plants (WTPs), and pipeline works using DI and HDPE materials including drinking water house hold connections.
Roads & Highways (Government of Telangana – HAM Projects):
- Execution of Widening, Strengthening & Maintenance of Selected Roads & Buildings (R&B) Roads under the Hybrid Annuity Model (HAM) – Phase I for the Government of Telangana.
- Package includes construction of 2-Lane with Paved Shoulders (2L+PS), 2Lane and 4-Lane roads, pavement strengthening, rehabilitation and associated civil infrastructure works across Mahabubnagar, Sangareddy and Vikarabad districts.
- Comprehensive scope covers earthwork, pavement construction, drainage systems, road safety features, junction improvements and long-term maintenance to ensure durable and sustainable road infrastructure.
- The combined execution spans over 554 km of strategic road network, significantly improving regional connectivity, traffic efficiency and road safety across Telangana.
- The project is being executed in compliance with Government of Telangana and R&B Department quality, safety and environmental standards, ensuring timely delivery of high-quality transportation infrastructure.
Irrigation Department Works:
- We are currently executing Palamuru Rangareddy Lift Irrigtion Scheme - Package 07 as Sub Contract to MEIL-VARKS JV. Shoda scope is 10KM 13mtr X 13mtr “D” Shape Tunnel.
- I&CADD - Palamuru Rangareddy District Lift Irrigation Scheme (Package No:7) - Construction of Tunnel from Km 6.40 to 9.70 between Veeranjaneya Reservoir at Yedulu (V) to Venkatadri Reservoir at Vattem (V) in Mahabub Nagar District.
- I&CADD - Palamuru Rangareddy District Lift Irrigation Scheme (Package No:7) - Construction of Tunnel from Km 9.70 to 16.39 between Veeranjaneya Reservoir at Yedulu (V) to Venkatadri Reservoir at Vattem (V) in Mahabub Nagar District.
- DLIS head reach Package No.02-Excavation of Tunnel from Km 5.525 to Km 11.025 for the Head Reach alignment of Dindi Lift Irrigation Scheme from Veeranjaneya Reservoir of Palamuru Rangareddy Lift Irrigation Scheme Project in Nagar Kurnool District.
OB Removal for Mining works:
- Drilling, Excavation, Loading, Transportation, Dumping, Spreading & Leveling etc., of 413.215 Lbcm of in-situ OB (which Includes 2.133 Lbcm of Top Soil, 8.861 Lbcm of Sub Soil, 375.686 Lbcm of Hard OB & 26.535 Lbcm of coal) with conventional equipment and additional works viz., 1000 shovel hours, 95,000 Rmt of drilling at Venkatesh Khani Coal Mine.
Panchayat Raj Department Works:
- Construction of High-Level Bridge on Road from Thimmareddyguda to Pamena of Shabad (M) in Ranga Reddy District.